ISO 9001 Risk Assessment: Make Your Risk Register Drive Your QMS
How to connect the register to corrective actions, customer complaints, nonconformities and management review, with the scoring tables worked through.
Free Excel Template · FORM-015
Most risk registers get built the week before an audit, then sit untouched until the next one. This risk register template gives your organization a scored, repeatable method instead. Pick a probability and three impact levels from drop-downs. The workbook returns a total risk score and flags anything at 7 or higher in red. The action, the owner and the review date stay beside the risk.
Tell us where to send it, and the download appears right after you submit the form.
Two sheets do all the work. The screenshots below come straight from the workbook with sample entries in place. Your own risks replace the sample rows, and the grey columns calculate as you go.
Give each risk a number and a plain description. Then choose how often it is expected to occur, from Not Likely through Occurs Often. The sheet looks up the matching probability score, from 1 to 5, in the scoring key. Nobody has to argue over what a 3 means, because the key defines it.
ISO 9001:2015 clause 6.1.1 · ISO/IEC 17025:2017 clause 8.5.1
Three more drop-downs rate the consequences. Company Image and Financial Risk each add 0, 1 or 2 points. Compliance Risk adds 2 points on its own, because a likely nonconformity deserves weight. The sheet adds the points to a base of 1, caps the impact score at 5, and adds the probability score to give the total. Any total of 7 or higher turns red.
ISO 9001:2015 clause 6.1.2 · ISO/IEC 17025:2017 clause 8.5.3
A score without an action is just a number. The treatment columns record what you already do to control the risk, or what you plan to do, along with the procedure that covers it. Name a risk owner, and the Last Updated column shows an assessor when you last looked at the row. Red rows need an entry here before the register is complete.
ISO 9001:2015 clause 6.1.2 · ISO/IEC 17025:2017 clause 8.5.2
The Scoring Key sheet defines every drop-down. Five probability levels run from Not Likely to Occurs Often, each with a score and a one line meaning. Change a label or a score here, and the register updates on its own. Keep the number of rows the same, and the lookups keep working.
Three short tables define the impact drop-downs. Each selection carries a point value and a meaning, so a High Cost in one department means the same thing in another. The compliance table is deliberately blunt: either the risk could produce a nonconformity against the standard, a customer or a regulator, or it could not.
Assessors ask how you reached a score. The scoring key answers in four lines. It shows where each score comes from, how the impact score caps at 5, and what the red flag means. The threshold sits in a single cell, so a lab that wants to act at 6 changes one number.
Nothing is hidden. Every lookup and every sum stays visible, so your quality manager can trace a red flag back to the two selections that produced it.
Twelve columns. Nine take your input, three calculate.
Dashed items calculate from the scoring key. The total also drives the red highlight.
Two tabs, each with one job.
Work left to right across the sheet. Most organizations draft a first register in a single meeting, then refine it as nonconformities, complaints and audits add to the picture.
Walk each process and ask what could stop it delivering. Add the issues from your context review, your interested parties, and, for a laboratory, any risk to impartiality.
Pick the probability from the drop-down. Use the meaning column in the scoring key, not gut feel, so two reviewers land on the same answer.
Select company image, financial and compliance impact. The sheet builds the impact score and the total. Watch for rows that turn red.
Record the action, the procedure that covers it and an owner. Keep the response proportionate to what the risk could do to your results or your products.
Revisit the register after a nonconformity, a complaint or a corrective action, and bring it to every management review. Update the date each time.
Fill in the short form below, and the download unlocks as soon as you submit. We use your details to send the file and occasional ISO 9001 and ISO 17025 guidance. You can unsubscribe at any time.
The workbook suits any organization that has to show how it identifies risks and what it does about them. That includes a first management system and a register nobody trusts.
You need to show an assessor that you considered the risks to your laboratory activities and to your impartiality, and that you planned actions in proportion to them. Start from a scored register rather than a blank list, and bring the results of risk identification to management review.
Risk-based thinking runs through the standard, but it does not tell you how to document it. This register gives you a method that fits in one sheet, so planning under clause 6.1 produces a record you can point to, update and review.
You already have a list of risks, scored by whoever wrote it. Move the entries across, rescore them with the drop-downs, and the red flags show you where the old register was guessing. The scoring key makes the method explainable to the next person too.
Yes. Submit the form, download the workbook, and use it in your organization at no cost. We ask for your details so we can send the file and share occasional ISO 9001 and ISO 17025 guidance.
Not in those words. ISO 9001:2015 clause 6.1 expects you to determine the risks and opportunities that need attention, plan actions to address them, build those actions into your processes and evaluate whether they worked. Annex A.4 adds that the standard calls for no formal risk management method and no documented risk management process.
A register is still the simplest way to show an auditor that you did the thinking. It also gives management review something concrete to evaluate under clause 9.3.2 e).
Yes. ISO/IEC 17025:2017 clause 8.5 expects a laboratory to consider the risks and opportunities tied to its activities, plan actions, and keep those actions proportional to the potential effect on the validity of results. The compliance column in the scoring key already names ISO/IEC 17025.
Laboratories should also use the register for risks to impartiality, which clause 4.1.4 expects you to identify on an ongoing basis. The same scores can set the risk levels that drive your response to nonconforming work under clause 7.10.1.
Two numbers add together. The probability score runs from 1 to 5 and comes straight from the probability drop-down. The impact score starts at 1, adds the points for company image, financial risk and compliance risk, and caps at 5. The total therefore runs from 2 to 10.
Compliance risk carries 2 points on its own, so a risk with no image or cost consequence still scores 3 for impact if it could cause a nonconformity. A total of 7 or higher turns red and calls for a documented action.
Yes. Every label, score and definition lives on the Scoring Key sheet, and the register reads from it. Rename a probability level, reweight financial impact, or rewrite a definition to fit your business, and the drop-downs and formulas follow.
The threshold is a single cell on the same sheet. Change 7 to 6 and the highlighting moves with it. Keep the number of rows in each table the same so the lookups stay intact.
Write down the action, name an owner and date the entry. The action can be a control you already operate, such as a procedure, a backup or a cross-training record, or something new you plan to put in place. Both standards expect a proportionate response. ISO 9001:2015 clause 6.1.2 ties it to the conformity of products and services. ISO/IEC 17025:2017 clause 8.5.3 ties it to the validity of results.
A severe risk may need more than a note, even when the total sits below 7. Consider a corrective action request or a change to the process.
The workbook is built around risks, which is where most audit questions land. Both standards pair risks with opportunities, so give opportunities a home as well. Many organizations keep a short opportunities list on a second sheet, with the same owner and date columns, and review it alongside the register at management review.
Opportunities also need a different question. Rather than asking how badly something could go wrong, ask what the upside is, what it would take, and who owns it.
Neither standard sets an interval. Two triggers cover most situations. First, revisit the register after a nonconformity, a complaint or a corrective action. ISO 9001:2015 clause 10.2.1 e) and ISO/IEC 17025:2017 clause 8.7.1 e) both expect you to update your risks and opportunities when needed. Second, bring it to every management review, where ISO 9001 asks about the effectiveness of your actions and ISO/IEC 17025 asks for the results of risk identification.
The Last Updated column makes both habits visible. A register where every date is a year old tells an assessor more than the scores do.
No template can do that on its own. The workbook gives you a defensible structure for identifying and scoring risks. Your conformity depends on whether the risks are real, the actions are implemented, and the register is reviewed and kept current. Verify every clause reference against your controlled copy of the standard before you rely on it.
Yes. Add your logo and document number to the title row, rename the sheets, and add or remove risk rows as your register grows. If you add rows beyond 50, copy the formulas down from the last row so the lookups and the red highlight extend with them. Treat the result as your own controlled document.
Microsoft Excel handles the workbook natively. It uses standard formulas, drop-down lists and conditional formatting, with no macros, so nothing is blocked on opening. The file also opens in most spreadsheet applications that read .xlsx, though drop-downs and highlighting can behave differently. Check the red flags after any conversion.
The register is one record in a larger system. These resources cover the thinking behind it and the places its results show up.
How to connect the register to corrective actions, customer complaints, nonconformities and management review, with the scoring tables worked through.
Read the guide →A phase by phase route to certification, including where risk-based thinking enters the planning and where the register gets reviewed.
Read the roadmap →Guides, technical articles and templates for laboratories and quality teams, updated as we publish.
Browse the library →Precision ISO implements ISO 9001 and ISO/IEC 17025 management systems from the context review through the first management review. We build the register with your team, connect it to your corrective action and complaint processes, and leave you with a system you can run without us.
This template is a customizable starting point. Review and adapt it to your organization's scope, processes and risk appetite before use. It does not constitute legal, regulatory, certification or accreditation advice, and it guarantees no audit or assessment outcome. Clause references point to ISO 9001:2015 and ISO/IEC 17025:2017. Verify every clause and reference against your controlled copies before you rely on them.